Quality Control

We believe that high quality contributes to benefit. Our quality control procedure starts at very beginning of each project. We ensure that every step is focused on.

MAIN QC PROCEDURE:
1. Design control
2. Steel Hardness Inspection
3. Electrodes Inspection
4. Steel Dimension Inspection
5. Pre-Assembly Inspection
6. Test Report and Samples Inspection
7. Pre-Shipment Inspection
8. Mould Package Inspection
 
After FOT, the actual test data can be revised to the tolerance,95% of the molds can pass the test on T2.